• Evidence Based Policy - Macroeconomic Research Center
U. Alex Akulich
Academic Director

Biography

Graduated from the Economics Faculty of the Belarusian State Academy of Communications majoring in «Marketing» (1998), finished postgraduate study at the Institute of Economics of the National Academy of Science of Belarus, majoring in «The Global Economy» (2001).

In 2002, he completed practical training at the National Bank of Belarus and an internship in CASE (Warsaw).

In 2002 he defended his thesis on “Formation of a currency mechanism in the Republic of Belarus”.

He worked as a research assistant in the Institute of Economics of the Republic of Belarus (2002-2003), at the Institute of Economics of the National Academy of Science of Belarus (2006-2010), the Bureau of Economic Research (2008-2010), CASE Belarus (2013-2017).

Since 2010, he teaches economic disciplines at the Belarusian State Economic University (BSEU).

Since 2017 – senior researcher for the Macroeconomic Research Center.

Sphere of research interests

Macroeconomic diagnostics; macroeconomic modeling and forecasting.

Foreign languages

English, Polish.

Specialized software

EViews, Stata.

Selected publications

An ideal economic model for Belarus”. In: “Belarus Reform Scenarios” (with Valetka, U.), Warsaw: S. Batory Foundation Publishing, 2003. – p. 142-169

The Global Competitiveness Index (GCI): dynamics of the position of Belarus (in Russian) / (with Valetka, U., Naurodski, S., Sushkevich, D.). Warsaw: CASE Belarus Publishing, 2015. – 73 p.

Capital and labour market in Belarus: equal status for long run growth / (with Valetka, U., Naurodski, S., and etc.). Warsaw: CASE Belarus Publishing, 2015. – 82 p.

Leonid Zlotnikov
Associate expert

Biography

Graduated from the Economic faculty of Moscow state University (MSU) majoring in « Economic cybernetics» (1968), finished postgraduate study at the Research Institute of Telecommunications (1976). In 1994 passed internship at CASE (Warsaw).

Worked as a research fellow at the Research Institute of the State Planning Commission of the BSSR (1968-1981), at the Institute of Economics of Academy of Science of the BSSR (1981-1989).

Worked as an economic advisor for the International Finance Corporation (1999-2001).

He taught economics at the Academy of Management under the President of the Republic of Belarus (2005-2007).

Sphere of research interests

Planning and forecasting of development of economic systems by using methods of mathematical modeling; problems of transformation of the command economy into a market one.

Foreign languages

English.

Specialized software

MATLAB.

Selected publications

In the Noose of Populism: Eleven Years of the Belarusian Economic Model (1991-2001) / The EU & Belarus. – London: Trans-European Policy Studies Association, 2002. – p. 127-155

Possibilities for the Development of a Private Economic Sector and a Middle Class as a Source of Political Change in Belarus / Independent Belarus. – Cambridge, Massachusetts: Harvard University, 2002. – p. 122-162

International symposium Belarus after 15 years of authoritarian rule: assessment and prospects. Helsinki Collegium for Advanced Studies, 18-19 May 2009

Zlotnikov, Leonid From Triumph to Failure – in One Electoral Cycle / Belarus. Reality. Get to the heart of the matter. Issue №19. Warsaw: Belarusian Analytical Workroom. September 2015. P. 11-16

Zlotnikov, Leonid Belarusian Economy 2014: Its Own Path Towards A «Landslide» / Belarus. Reality. Get to the heart of the matter. Issue №16. Warsaw: Belarusian Analytical Workroom. February 2015. P. 9-14

Zlotnikov, Leonid The Deadlocks of Integration in the Eurasian Economic Community / Belarus. Reality. Get to the heart of the matter. Issue №14. Warsaw: Belarusian Analytical Workroom. September 2014. P. 16-24

Zlotnikov, Leonid Belarusian Economy Growth Rates Are Seriously Exaggerated / Belarus. Reality. Get to the heart of the matter. Issue №2. Warsaw: Belarusian Analytical Workroom. July 2012.

Zlotnikov, Leonid The Belarusian «economic miracle» – illusions and reality / Chaillot Paper. Back from the Cold? The EU and Belarus. Issue №119. Paris: Institute for Security Studies. November 2009. P. 65-78

Злотников, Леонид Выживание или интеграция / Pro et Contra. Москва. Том 3, №2. Россия и ее западные соседи. 1998. – P. 81-94

Irene Rusak
Senior Researcher

Biography

Graduated from the faculty of management of the Belarusian State Economic University (BSEU) with a degree in Public Administration (2007), the Bachelor’s degree in BSEU (2008) and the BSEU postgraduate course (2011), specializing in Economics and National Economy Management.

In 2016 she defended her thesis on the topic “Competitiveness of the regions of the Republic of Belarus: assessment methodology and directions of improving”.

Since 2009 teaches economic disciplines in BSEU.

Since 2017 – senior researcher for the Macroeconomic Research Center.

Sphere of research interests

Competitiveness and innovative attractiveness of the economy; regional and urban economy; territorial planning; public administration and local government; regional financial system.

Foreign languages

English, Polish.

Specialized software

EViews, Stata, ArcView, GeoDa.

Selected publications

Rusak, I.N. Assessment of the level of competitiveness of the regions of the Republic of Belarus: monogr. (in Russian) / I.N. Rusak. – Minsk: Entsiklopediks, 2014. – p. 170.

Rusak, I.N. Territorially-oriented approach to the development of territories as a tool for sustainable development at the local level (in Russian) / I.N. Rusak, et al. // Information package in 2 parts . Within the framework of the EU / UNDP project “Promoting local development in the Republic of Belarus”, Minsk, 2016. Part 1, Part 2. – p. 154.

Rusak, I.N. Management of regional development and its improvement in the context of administrative reform in the Republic of Belarus (in Russian) / I.N. Rusak, Т.V. Buhovets // Bulletin of the Khmelnytsky National University / Pereyaslav-Khmelnitsk. nat. un-ty, ed. of the senate: M.E. Skriba [et al.]. – Pereyaslav-Khmelnitsky, 2017. – ed. 2. – Vol. 2 – p. 290 . – P.68-74

Tatiana Korzun
Projects Coordinator

Biography

Graduated from the faculty of management of the Belarusian State Economic University (BSEU) with a degree in Public Administration (2003) and the BSEU postgraduate course (2017), specializing in Economics and National Economy Management.

She worked as a public servant at the Administration of Minsk Tsentralny District (2003-2012).

Since 2013 teaches economic disciplines in BSEU.

Since 2017 – Projects Coordinator of the Macroeconomic Research Center.

Sphere of research interests

Innovation and economic growth, economic structure and structural change, public administration and local government.

Foreign languages

English.

Specialized software

EViews, JDemetra.

Selected publications

Korzun, Т.S. Experience in reforming innovation policy in the new EU countries and candidate countries for accession to the EU / N.I. Bogdan, Т.S. Korzun // Science and Innovations, 2005. №8. P. 62-69

Julia Novikava
Researcher

Biography

Faculty of economics and management of Belorussian state economic university (BSEU), specialization «National economy» (2016 – present), qualification: economist – analyst.

Finished the first school on economic analysis (Macrocenter).

Since 2017 – researcher of macroeconomic research center.

Sphere of research interests

Econometrics; macroeconomic modeling.

Foreign languages

English.

Specialized software

EViews, JDemetra, STATA

Selected publications

Akulich U.A., Conjunctural Growth U.A. Akulich, Yu.M. Novikava // The economy of Belarus [Electronic resource]. – 2019.

Novikava Yu.M. The analysis of indicators of disability of the child population in the Republic of Belarus / Yu.M. Novikava, I.V. Gan, E.Yu. Kravchuk; scient. dir. U.A. Akulich // NIRS BSEU: collection of scientific articles. Issue 7 / [Editorial: A.A. Bykov (prev. and others.); Education of the Republic of Belarus, Belorussian State Economic University – Minsk: BSEU, 2018. – p. 216-222.