
Biography
Graduated from the Economics Faculty of the Belarusian State Academy of Communications majoring in «Marketing» (1998), finished postgraduate study at the Institute of Economics of the National Academy of Science of Belarus, majoring in «The Global Economy» (2001).
In 2002, he completed practical training at the National Bank of Belarus and an internship in CASE (Warsaw).
In 2002 he defended his thesis on “Formation of a currency mechanism in the Republic of Belarus”.
He worked as a research assistant in the Institute of Economics of the Republic of Belarus (2002-2003), at the Institute of Economics of the National Academy of Science of Belarus (2006-2010), the Bureau of Economic Research (2008-2010), CASE Belarus (2013-2017).
Since 2010, he teaches economic disciplines at the Belarusian State Economic University (BSEU).
Since 2017 – senior researcher for the Macroeconomic Research Center.
Sphere of research interests
Macroeconomic diagnostics; macroeconomic modeling and forecasting.
Foreign languages
English, Polish.
Specialized software
EViews, Stata.
Selected publications
An ideal economic model for Belarus”. In: “Belarus Reform Scenarios” (with Valetka, U.), Warsaw: S. Batory Foundation Publishing, 2003. – p. 142-169
The Global Competitiveness Index (GCI): dynamics of the position of Belarus (in Russian) / (with Valetka, U., Naurodski, S., Sushkevich, D.). Warsaw: CASE Belarus Publishing, 2015. – 73 p.
Capital and labour market in Belarus: equal status for long run growth / (with Valetka, U., Naurodski, S., and etc.). Warsaw: CASE Belarus Publishing, 2015. – 82 p.

Biography
Graduated from the Economic faculty of Moscow state University (MSU) majoring in « Economic cybernetics» (1968), finished postgraduate study at the Research Institute of Telecommunications (1976). In 1994 passed internship at CASE (Warsaw).
Worked as a research fellow at the Research Institute of the State Planning Commission of the BSSR (1968-1981), at the Institute of Economics of Academy of Science of the BSSR (1981-1989).
Worked as an economic advisor for the International Finance Corporation (1999-2001).
He taught economics at the Academy of Management under the President of the Republic of Belarus (2005-2007).
Sphere of research interests
Planning and forecasting of development of economic systems by using methods of mathematical modeling; problems of transformation of the command economy into a market one.
Foreign languages
English.
Specialized software
MATLAB.
Selected publications

Biography
Graduated from the faculty of management of the Belarusian State Economic University (BSEU) with a degree in Public Administration (2007), the Bachelor’s degree in BSEU (2008) and the BSEU postgraduate course (2011), specializing in Economics and National Economy Management.
In 2016 she defended her thesis on the topic “Competitiveness of the regions of the Republic of Belarus: assessment methodology and directions of improving”.
Since 2009 teaches economic disciplines in BSEU.
Since 2017 – senior researcher for the Macroeconomic Research Center.
Sphere of research interests
Competitiveness and innovative attractiveness of the economy; regional and urban economy; territorial planning; public administration and local government; regional financial system.
Foreign languages
English, Polish.
Specialized software
EViews, Stata, ArcView, GeoDa.
Selected publications
Rusak, I.N. Assessment of the level of competitiveness of the regions of the Republic of Belarus: monogr. (in Russian) / I.N. Rusak. – Minsk: Entsiklopediks, 2014. – p. 170.
Rusak, I.N. Territorially-oriented approach to the development of territories as a tool for sustainable development at the local level (in Russian) / I.N. Rusak, et al. // Information package in 2 parts . Within the framework of the EU / UNDP project “Promoting local development in the Republic of Belarus”, Minsk, 2016. Part 1, Part 2. – p. 154.
Rusak, I.N. Management of regional development and its improvement in the context of administrative reform in the Republic of Belarus (in Russian) / I.N. Rusak, Т.V. Buhovets // Bulletin of the Khmelnytsky National University / Pereyaslav-Khmelnitsk. nat. un-ty, ed. of the senate: M.E. Skriba [et al.]. – Pereyaslav-Khmelnitsky, 2017. – ed. 2. – Vol. 2 – p. 290 . – P.68-74

Biography
Graduated from the faculty of management of the Belarusian State Economic University (BSEU) with a degree in Public Administration (2003) and the BSEU postgraduate course (2017), specializing in Economics and National Economy Management.
She worked as a public servant at the Administration of Minsk Tsentralny District (2003-2012).
Since 2013 teaches economic disciplines in BSEU.
Since 2017 – Projects Coordinator of the Macroeconomic Research Center.
Sphere of research interests
Innovation and economic growth, economic structure and structural change, public administration and local government.
Foreign languages
English.
Specialized software
EViews, JDemetra.
Selected publications
Korzun, Т.S. Experience in reforming innovation policy in the new EU countries and candidate countries for accession to the EU / N.I. Bogdan, Т.S. Korzun // Science and Innovations, 2005. №8. P. 62-69

Biography
Education:
1.09.2017 – present : Belarusian state University of Economics, Minsk (3-rd year student of full-time education on a budget basis).
Specialty: national economy
Qualification: economist-analyst
From 01.11.2017 – present: researcher at the company “Macrocenter ”
2018 – present – Student School of Economic Analysis
Sphere of research interests
Big data in sports.
Foreign languages
English (Intermediate), Polish(Intermediate).
Specialized software
EViews, JDemetra, MS Office
Selected publications

Biography
Education:
1.09.2017 – present : Belarus State University of Economics.
Specialty: National economy
Qualification: Economist-analyst
From 01.11.2017 – present: researcher at the company MACROCENTER
2018 – present – Student School of Economic Analysis
Sphere of research interests
Big data analytics
Foreign languages
English (Upper-Intermediate), Germany(Pre-Intermediate).
Specialized software
EViews, JDemetra
Selected publications

Biography
Graduated from the faculty of management of the Belarusian State Economic University (BSEU) with a degree in Public Administration (2003) and the BSEU postgraduate course (2010), specializing in Economics and National Economy Management.
Since 2010 teaches economic disciplines in BSEU.
Since 2017 – Projects Coordinator of the Macroeconomic Research Center.
Sphere of research interests
Public administration, local government and self-government, innovation and economic growth, regional economy and management, green economy
Foreign languages
English
Specialized software
EViews
Selected publications
Bukhavets, Т.V. Foreign experience of the influence of cultural factors on the economy of the region / Т.В. Bukhovets, I.N. Rusak // Bulletin of BSEU. – Minsk: BSEU, 2015. – No. 3. – 124 p. – P. 19-26.
Rusak, I.N., Bukhavets, Т.В. Management of regional development and its improvement in the context of administrative reform in the Republic of Belarus / I.N. Rusak, Т.В. Буховец // Вісник Хмельницького національного університету / Pereyaslav-Khmelnitsk. nat. un-t, ed. I’m glad: M.E. Skriba [t.in.]. – Pereyaslav-Khmelnitsky, 2017. – Vip. 2. – T. 2 -290 s. – P.68-74.

Biography
Education:
1.09.2017 – present: Belarus State University of Economics.
Specialty: National economy.
Qualification: Economist-analyst
From 01.11.2017 – present: researcher at the company Macrocenter
2018 – present – Student School of Economic Analysis.
Sphere of research interests
Big Data in Retail
Foreign languages
English (Intermediate).
Specialized software
EViews, JDemetra, Qlik, Python.